Chapter 1: AC-2500 Series Hardware
NetEnforcer AC-2500 Hardware Guide
1-26
Powering Up Via LCD Panel
NOTE
The NetEnforcer and the Bypass Unit have to be fully plugged and
connected before power is turned on. This is to ensure proper and
systematic power up.
It is recommended to connect the two power line feeds to separate power sources to
have full power redundancy. The two bi-color
Power
LEDs on the rear of NetEnforcer
are lit indicating that the power supply is connected to power and no failure condition
exists.
The
Power
LED on the LCD panel is lit and the
Mode
LED on the Bypass Unit is off,
indicating that the power is on and NetEnforcer is bypassed.
The display area of the LCD panel indicates the following:
Power On
.
After a few seconds, the display area of the LCD panel indicates the following:
System Loading *
.
Once the system has completed loading, the following occurs:
The
Active
LED on the LCD panel is lit and the
Mode
LED on the Bypass Unit is lit,
meaning that NetEnforcer is now connected to the network.
The display area of the LCD panel indicates the default view - the current bandwidth
consumption. For example:
Inbound: XXX.X
Outbound: YYY.Y