IX5-28GPX Installation Guide
73
Monitoring the Initialization Processes
It takes about thirty seconds for the switch to initialize its management
software programs and features, and load the default configuration. You
may monitor the progress of the initialization process by watching the
switch ID LED. It displays the number “8” for about the first 15 seconds
and then displays the number “1.”
You may also monitor the bootup sequence by connecting a terminal or
computer that has a terminal emulator program, to the Console port on the
master switch. You will see the messages in Figure 31 here to Figure 33
on page 75.
Bootloader 2.0.15 loaded
Press <Ctrl+B> for the Boot Menu
Reading filesystem...
Loading flash:x510-5.4.3-3.7.rel...
Verifying release... OK
Booting...
Starting base/first...
[
OK
]
Mounting virtual filesystems... [
OK
]
______________
____
/\ \
/ /______\
/
\ \_
__/ /| ______ |
/
\ |
|
/
| ______ |
/
\ \
/ /
\ ____ /
/______/\____\ \/ /____________/
Allied Telesis Inc.
AlliedWare Plus (TM) v5.4.2A
Current release filename: x510-5.4.3-3.7.rel
Original release filename: x510-5.4.3-3.7.rel
Built: 08-Oct-2013 10:43:42 NZDT 2013 by: maker@maker04-build
Mounting static filesystems...
[
OK
]
Checking flash filesystem...
[
OK
]
Mounting flash filesystem...
[
OK
]
Checking NVS filesystem...
[
OK
]
Mounting NVS filesystem...
[
OK
]
Starting base/dbus...
[
OK
]
Starting base/syslog...
[
OK
]
Summary of Contents for AT-IX5-28GPX
Page 10: ...Tables 10 ...
Page 14: ...Preface 14 ...
Page 60: ...Chapter 3 Beginning the Installation 60 ...
Page 76: ...Chapter 4 Installing the Switch and its Power Supplies 76 ...
Page 84: ...Chapter 5 Configuring the Switch for Stand alone Operations 84 ...
Page 90: ...Chapter 6 Verifying the Status of VCStack and Activating VCStack 90 ...
Page 116: ...Chapter 9 Cabling the Networking Ports 116 ...
Page 122: ...Chapter 10 Troubleshooting 122 ...