Chapter 4: Installing the Switch and its Power Supplies
74
Figure 31. Switch Initialization Messages
Figure 32. Switch Initialization Messages (Continued)
Starting base/loopback...
[
OK
]
Starting base/poe_done...
[
OK
]
Starting base/sysctl...
[
OK
]
Received event poefw.done
Starting base/portmapper...
[
OK
]
Received event syslog.done
Starting base/reboot-stability...
[
OK
]
Starting base/autofs-card...
[
OK
]
Checking system reboot stability...
[
OK
]
Starting base/cron...
[
OK
]
Starting base/appmond...
[
OK
]
Starting hardware/openhpi...
[
OK
]
Starting hardware/timeout...
[
OK
]
Starting base/inet...
[
OK
]
Starting base/modules...
[
OK
]
Received event modules.done
Received event board.inserted
Received event hardware.done
Starting network/startup...
[
OK
]
Starting network/stackd...
[
OK
]
Starting network/election.timeout...
[
OK
]
Received event network.enabled
Initializing HA processes:
openhpid, hostd, cntrd, nsm, auth, epsr, hsl
imiproxyd, irdpd, lldpd, loopprot, mstp
rmon, sflowd, udldd, vrrpd, imi
lacp, pdmd
Received event network.initialized
03:44:11 awplus-1 VCS[826]: No neighboring members found, unit may be in a
stand alone configuration
03:44:11 awplus-1 VCS[826]: Startup speed can be improved by adding 'no stack
1 enable' to configuration
Received event vcs.elected-master
03:44:11 awplus-1 VCS[826]: Member 1 (0015.774f.ed30) has become the Active
Master
Summary of Contents for AT-IX5-28GPX
Page 10: ...Tables 10 ...
Page 14: ...Preface 14 ...
Page 60: ...Chapter 3 Beginning the Installation 60 ...
Page 76: ...Chapter 4 Installing the Switch and its Power Supplies 76 ...
Page 84: ...Chapter 5 Configuring the Switch for Stand alone Operations 84 ...
Page 90: ...Chapter 6 Verifying the Status of VCStack and Activating VCStack 90 ...
Page 116: ...Chapter 9 Cabling the Networking Ports 116 ...
Page 122: ...Chapter 10 Troubleshooting 122 ...