IX5-28GPX Installation Guide
63
Installing Power Supply Modules
Overview
The AT-IX5-28GPX switch has two rear slots for hot-swappable power
supplies. You can install one or two AT-PWR800 power supplies.
The switch is supplied with a factory installed blank panel that covers both
power supply slots, and with a separate blank panel to use if you only
install one power supply.
The installation procedure is identical for each power supply.
Installing a
Power Supply
To install a power supply, perform the following procedure:
1. Remove the module from the shipping package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Remove the blank panel from the power supply slots on the rear panel
of the switch by unscrewing it, as shown in the following figure.
Figure 19. Removing the rear panel
Summary of Contents for AT-IX5-28GPX
Page 10: ...Tables 10 ...
Page 14: ...Preface 14 ...
Page 60: ...Chapter 3 Beginning the Installation 60 ...
Page 76: ...Chapter 4 Installing the Switch and its Power Supplies 76 ...
Page 84: ...Chapter 5 Configuring the Switch for Stand alone Operations 84 ...
Page 90: ...Chapter 6 Verifying the Status of VCStack and Activating VCStack 90 ...
Page 116: ...Chapter 9 Cabling the Networking Ports 116 ...
Page 122: ...Chapter 10 Troubleshooting 122 ...