101
Chapter 8
Powering On the Stack
This chapter contains the following procedures:
“Powering On the Switches Individually” on page 102
“Powering On the Switches Simultaneously” on page 104
“Verifying the Stack” on page 106
Perform “Powering On the Switches Individually” on page 102 if you want
to control the assignment of the ID numbers to the switches of the stack.
The numbers are assigned in the order in which you power on the units.
Otherwise, perform “Powering On the Switches Simultaneously” on
page 104 to have the switches assign the numbers automatically.
After the ID numbers are assigned, you may change them with the STACK
RENUMBER command, described in the
Software Reference: AlliedWare
Plus Operating System for IX5-28GPX Switches
.
Caution
You should not change the ID numbers of the switches after you
begin to configure the parameter settings. Otherwise, the stack
might assign configuration settings to the wrong units.
Summary of Contents for AT-IX5-28GPX
Page 10: ...Tables 10 ...
Page 14: ...Preface 14 ...
Page 60: ...Chapter 3 Beginning the Installation 60 ...
Page 76: ...Chapter 4 Installing the Switch and its Power Supplies 76 ...
Page 84: ...Chapter 5 Configuring the Switch for Stand alone Operations 84 ...
Page 90: ...Chapter 6 Verifying the Status of VCStack and Activating VCStack 90 ...
Page 116: ...Chapter 9 Cabling the Networking Ports 116 ...
Page 122: ...Chapter 10 Troubleshooting 122 ...