x510 Series Installation Guide for Virtual Chassis Stacking
59
Unpacking the Switch
Figure 16 lists the items that come with the switch. If any item is missing or
damaged, contact your Allied Telesis sales representative for assistance.
Figure 16. Components of the switch
Note
You should retain the original packaging material in the event you
need to return the unit to Allied Telesis.
After checking the contents of the shipping containers, go to Chapter 4,
“Installing the Switch and its Power Supplies” on page 61
1947
Two rack mounting brackets
One 2 m (6.6 ft) local management cable with
RJ-45 (8P8C) and DB-9 (D-sub 9-pin)
connectors.
2047
Twelve rack mounting bracket
screws
AT-PNL800/1200
One AT-PLN800/1200 blank panel for
covering an empty power supply bay
Summary of Contents for AT-IX5-28GPX
Page 10: ...Tables 10 ...
Page 14: ...Preface 14 ...
Page 60: ...Chapter 3 Beginning the Installation 60 ...
Page 76: ...Chapter 4 Installing the Switch and its Power Supplies 76 ...
Page 84: ...Chapter 5 Configuring the Switch for Stand alone Operations 84 ...
Page 90: ...Chapter 6 Verifying the Status of VCStack and Activating VCStack 90 ...
Page 116: ...Chapter 9 Cabling the Networking Ports 116 ...
Page 122: ...Chapter 10 Troubleshooting 122 ...