
AT-DC2552XS / L3 Enterprise Core Switch Installation Guide
85
Figure 44. Connecting the Twisted Pair Cable into the NET MGMT port
3. With the AT-DC2552XS / L3 and link partner network device powered
on, verify that the NET MGMT port LINK/ACT LED is either amber or
green. Refer to “NET MGMT LED” on page 27 for the functional
description of this LED. Refer to Chapter 8, “Troubleshooting” on page
87 if this LED does not illuminate.
Summary of Contents for AT-DC2552XS
Page 1: ...613 002097 Rev A AT DC2552XS L3 ENTERPRISE CORE SWITCH Installation Guide...
Page 8: ...Figures 8...
Page 10: ...Tables 10...
Page 14: ...Preface 14...
Page 34: ...Chapter 1 Overview 34...
Page 44: ...Chapter 2 VCStack Overview 44...
Page 86: ...Chapter 7 Managing the Switch 86...
Page 90: ...Chapter 8 Troubleshooting 90...