
AT-DC2552XS / L3 Enterprise Core Switch Installation Guide
73
Installing QSFP+ Transceivers and Cables
Review the following guidelines before installing optional QSFP+
transceivers in the switch:
QSFP+ transceivers can be hot-swapped while the switch is
powered on. However, you should always disconnect the fiber
optic cables first before removing a module.
You should install the module before connecting the fiber optic
cable.
Unnecessary removal and insertion of a module can lead to
premature failure.
Go to “Optional QSFP+ Transceivers” on page 18 for a list of
approved QSFP+ transceivers for the AT-DC2552XS / L3.
Allied Telesis recommends using the following SFP+ cables listed
in Table 10:
Installing a
QSFP+
Transceiver
Perform the following procedure to install a QSFP+ transceiver:
1. Remove the module from its shipping container and store the
packaging material in a safe location.
2. Remove the dust cover from the chassis QSFP+ slot. See Figure 37
on page 74.
Table 10. QSFP+ Cables
Port
Cable Used
Max Transmission Distance
40GBASE-SR4
AT-QSFPSR
GI 50/125 multimode fiber
(In accordance with ITU-T
G.651)
26m (At 400MHz - km transmission band)
30m (At 500MHz - km transmission band)
100m (At 2000MHz - km transmission band)
150m (At 4700MHz - km transmission band)
ET3-MTP 12-1
MTHTP cable for AT-QSFPSR
GI 50/125 multimode fiber
(In accordance with ITU-T
G.651)
1m
ET3-MTP 12-5
5m
Summary of Contents for AT-DC2552XS
Page 1: ...613 002097 Rev A AT DC2552XS L3 ENTERPRISE CORE SWITCH Installation Guide...
Page 8: ...Figures 8...
Page 10: ...Tables 10...
Page 14: ...Preface 14...
Page 34: ...Chapter 1 Overview 34...
Page 44: ...Chapter 2 VCStack Overview 44...
Page 86: ...Chapter 7 Managing the Switch 86...
Page 90: ...Chapter 8 Troubleshooting 90...