
Chapter 3: Beginning the Installation
52
Unpacking the Switch
Refer to the following figures in this section to verify the contents of the
shipping containers:
”AT-DC2552XS/L3 Switch”
“AT-PWR06 Power Supply” on page 53
“AT-FAN06 Fan Module” on page 54
Note
If any item in a shipping container is missing or damaged, contact
your Allied Telesis sales representative for assistance.
AT-DC2552XS/
L3 Switch
The contents of the AT-DC2552XS / L3 shipping box are listed in Figure
17.
Figure 17. Contents of the AT-DC2552XS / L3 Shipping Box
Note
You should retain the original packaging material in the event you
need to return the unit to Allied Telesis.
One AT-DC2552XS / L3 switch
Two rack mounting brackets with
eight bracket screws
Desktop mounting feet
One 2 m (6.6 ft) local management cable with
USB and DB-9 (D-sub 9-pin) connectors.
Summary of Contents for AT-DC2552XS
Page 1: ...613 002097 Rev A AT DC2552XS L3 ENTERPRISE CORE SWITCH Installation Guide...
Page 8: ...Figures 8...
Page 10: ...Tables 10...
Page 14: ...Preface 14...
Page 34: ...Chapter 1 Overview 34...
Page 44: ...Chapter 2 VCStack Overview 44...
Page 86: ...Chapter 7 Managing the Switch 86...
Page 90: ...Chapter 8 Troubleshooting 90...