
Publication 2711P-UM001B-EN-P
3-8
Applying Power
Startup Sequence
After a reset, the PanelView Plus performs a series of startup tests and
then either:
•
runs the .MER application currently loaded in the terminal
•
enters PanelView Plus configuration mode
The action that occurs depends on what startup options are
configured for your PanelView Plus terminal.
Summary of Contents for PanelView Plus 2711P
Page 1: ...PanelView Plus Operator Terminals 2711P 400 600 700 1000 1250 1500 User Manual AB Drives...
Page 6: ...Publication 2711P UM001B EN P Table of Contents iv...
Page 112: ...Publication 2711P UM001B EN P 5 22 Installing and Replacing Components...
Page 154: ...Publication 2711P UM001B EN P 8 16 Troubleshooting and Maintenance...
Page 160: ...Publication 2711P UM001B EN P B 2 Compatible USB Devices...
Page 169: ...AB Drives...