Rockwell Automation Publication 1756-UM001O-EN-P - October 2014
153
Develop Applications
Chapter 10
Scheduled and Unscheduled Programs
The scheduled programs within a task execute to completion from first to last.
Programs that are not attached to any task show up as unscheduled programs.
Unscheduled programs within a task are downloaded to the controller with the
entire project. The controller verifies unscheduled programs but does not execute
them.
You must schedule a program within a task before the controller can scan the
program. To schedule an unscheduled program, use the Program/Phase Schedule
tab of the Task Properties dialog box.
Figure 34 - Scheduling an Unscheduled Program
Summary of Contents for 1756-L63XT
Page 4: ...4 Rockwell Automation Publication 1756 UM001O EN P October 2014 Summary of Changes Notes...
Page 18: ...18 Rockwell Automation Publication 1756 UM001O EN P October 2014 Preface Notes...
Page 136: ...136 Rockwell Automation Publication 1756 UM001O EN P October 2014 Chapter 8 I O Modules...
Page 210: ...210 Rockwell Automation Publication 1756 UM001O EN P October 2014 Index Notes...
Page 211: ......