
30
PRATIK - Installation use and maintenance ENG- EDITION: 2018-07-05
5.7
COMPLETING THE INSTALLATION
• Raise the lift at an appropriate height
• Secure the lift to the floor, after checking that the location is that that you want
• Perform the holes in correspondence of the 8 holes of the bases of the platforms (Fig. 16) with 10 mm drill,
to a depth of about 95 mm. (Figure 16) • Clean the holes and insert the screw anchors of the type indicated
in the "Technical data", with light hammer blows.
• Secure the lift to the floor
• If the installation is in-floor, the components related to this type of installation should also be fixed (Fig. 4)
They are supplied with the lift.
• Fix the ramps as in (Figs. 2 and 3) • Replace, to regular connections, all controller shell with its screws.
5.7.1
DEFINITION OF DANGER AREA
• Delimiting the perimeter of the danger of the machine by painting a band of width equal to 10 cm. with
indelible paint yellow complying with the measurements shown in Figure 8
5.7.2
AREAS AT RISK
Check before operating the lift that inside the danger area bounded by the yellow stripe (Fig. 8), there are no
people or animals.
• It is absolutely forbidden the standing or the passage of people or animals inside the dangerous area
bounded by the yellow stripe (Fig. 8), when functioning, even for short trips, and when the emergency switch
/ OFF (10 Fig. 1A) is in the "off" position (0)
• In Photo 8 highlights the risk of deck areas for people or animals. It is absolutely forbidden to approach this
zone if the lift is moving to the danger of the moving parts of the machine.
Summary of Contents for PRATIK 30
Page 2: ...2 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 3: ...3 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 4: ...4 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 37: ...37 PRATIK Installation use and maintenance ENG EDITION 2018 07 05 8 0 HYDRAULIC SCHEME...
Page 38: ...38 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 42: ...42 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 44: ...44 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 53: ...53 PRATIK Installation use and maintenance ENG EDITION 2018 07 05 TAV 3 CONTROL UNIT...