
28
PRATIK - Installation use and maintenance ENG- EDITION: 2018-07-05
5.6.1
FIRST INSTALLATION:
CAUTION: CARRY OUT IN THE ORDER DESCRIBED BELOW
1
2
FIG.9A
2 - PRESS THE UP BUTTON (PS) AND BRING THE
PLATFORMS TO THE MAXIMUM HEIGHT
1 - CONNECT THE PIPES HYDRAULIC 1, 2
and 3 AS FROM PICTURE 9
.
3 - REMOVE THE SOLENOID (1) BY
ELECTROVALVE
YVC1.
4 - INSERT THE EXHAUST PIPE (3) DIRECTLY
INTO THE HOLE THE TANK.
YVC1
1
3
FIG. 10
PS
5 –PRESS UP BUTTON (PS) AND CHECK THAT THE
EXHAUST PIPE (3 FIG 10) OIL COMES OUT.
6 - REFIT THE SOLENOID (1) TO THE ELECTROVALVE
YVC1
(FIG. 10)
FIG. 10A
T
3
FIG.9
PS
Summary of Contents for PRATIK 30
Page 2: ...2 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 3: ...3 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 4: ...4 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 37: ...37 PRATIK Installation use and maintenance ENG EDITION 2018 07 05 8 0 HYDRAULIC SCHEME...
Page 38: ...38 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 42: ...42 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 44: ...44 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 53: ...53 PRATIK Installation use and maintenance ENG EDITION 2018 07 05 TAV 3 CONTROL UNIT...