43
PRATIK - Installation use and maintenance ENG- EDITION: 2018-07-05
9.
RESERVED TO THE INSTALLER TECHNICIAN
VERIFICA DA COMPIERSI AL TERMINE DELL’INSTALLAZIONE
CHECKS TO BE CARRIED OUT AT THE END OF THE INSTALLATION
CONTROLLI /
CONTROLS
SI
NO
NOTE
1
Check of screw securing lift to floor correct installation and sealing capacity
2
Check of correct electric hook-up (according to standards)
3
Check of correct operation (according to manual)
4
Check for correct operation of the (accidental misalignment) hydraulic
safety devices
5
Check for electric safety devices (fc1 and pda) correct operation
6
Check for correct automatic alignment at maximum height
7
Check of oil level
8
Check for sliding members and friction parts correct lubrication
9
Check for emergency switch operation
10
Check of emergency lowering operation
11
Check of label application according to diagram
12
Full-load lift testing
13
Check for user's correct understanding of lift operation
14
Check for user's correct understanding of lift operation
15
Inspection records filling out
NOTE
STAMP / SIGNATURE USER
STAMP / SIGNATURE INSTALLER
Summary of Contents for PRATIK 30
Page 2: ...2 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 3: ...3 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 4: ...4 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 37: ...37 PRATIK Installation use and maintenance ENG EDITION 2018 07 05 8 0 HYDRAULIC SCHEME...
Page 38: ...38 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 42: ...42 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 44: ...44 PRATIK Installation use and maintenance ENG EDITION 2018 07 05...
Page 53: ...53 PRATIK Installation use and maintenance ENG EDITION 2018 07 05 TAV 3 CONTROL UNIT...