1 — Introduction
2902 MainStreet Technical Practices
1-11
May 2002 90-2906-01
Table 1-2 Maximum power requirements
Note
(1)
Occurs when two data interface modules and two LIMs are used.
Grounding requirements
The chassis must be connected to a building ground point, usually a metal water pipe
or building steel. The cable must be long enough to connect the ground screw on the
rear panel to the building ground point without splicing. Use a cable that is a
minimum of 16 AWG (1.5 mm nominal diameter). A cable that is 10 AWG (2.6 mm
nominal diameter) or 12 AWG (2 mm nominal diameter) is recommended.
For grounding information and instructions, refer to chapter 4.
1.6
Installation summary
Table 1-3 serves as a reference summary for the installation procedures.
Table 1-3 Installation summary
1.7
Installation tools and hardware required
Table 1-4 lists the tools and hardware are required to install a 2902 MainStreet
system (listed by activity). Some tools or hardware may not apply to your particular
installation.
Supplied voltage
Minimum voltage
Maximum
voltage
Maximum power
requirement
100 V ac
90 V ac
110 V ac
42 W
230 V ac
207 V ac
253 V ac
42 W
Step
Reference
1. Unpack and inspect the components.
Chapter 2
2. Mount the unit.
Chapter 3
3. Ground the unit
.
Section 4.1
4. Connect to power and conduct the power-up test.
5. Install the modules.
Chapter 5
6. Connect to the network.
Chapter 6
7. Connect the data devices.
Chapter 7
8. Connect the node management terminal.
Chapter 8
9. Connect the external alarm devices.
Chapter 9
10. Switch on the power.
Section 4.2
Summary of Contents for MainStreet 2902
Page 1: ...2902 MainStreet Network Termination Unit Release 1 0 H T E C H N I C A L P R A C T I C E S ...
Page 40: ...3 Mounting the unit 3 8 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 50: ...4 Ground and power connections 4 10 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 68: ...6 Connecting to the network 6 4 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 90: ...7 Connecting to data devices 7 22 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 108: ...10 Node management 10 10 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 150: ...14 CPSS 14 6 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 218: ...20 Codirectional DCM 20 6 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 234: ...22 HCM rate adaption 22 10 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 246: ...23 Cross connecting circuits 23 12 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 254: ...24 Visual indicators 24 8 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 266: ...25 Alarms 25 12 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 278: ...26 System diagnostics 26 12 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 298: ...27 Loopbacks 27 20 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 332: ...Glossary GL 8 2902 MainStreet Technical Practices 90 2906 01 May 2002 ...
Page 343: ......
Page 344: ... 2002 Alcatel All rights reserved 90 2906 01 95 1820 01 00 C ...