W.T.D. Rack installation
A.1. Mechanical
installation
Installation has been sub–divided into the following phases:
-
Rack Positioning and Fastening
-
Fixing the rack to floor using expansion bolts or Fixing to floating floor;
-
T.R.U. fastening to W.T.D rack.
A.1.1.
Rack Positioning and Fastening
Proceed as follows:
-
Refer to the plant documentation to see rack row assignment
-
Fasten the rack to the station structure according to one of the following procedures:
-
Fixing the rack to floor (see paragraph 2.2.3)
-
Fixing the rack to floating floor (see paragraph 2.2.4)
A.1.2.
Fixing the rack to floor using expansion bolts
(See Figure 83 on page 95)
-
Mount the rack in a vertical position in the desired place.
-
Mark the base–plate with six holes (
1
) to be drilled on the floor
-
Temporarily remove the rack and drill the holes at the points drawn on the floor (see Figure 84 on page
96).
-
Place the inserts into the holes
-
Secure the expander bolts to the floor through the base–plate holes.
Summary of Contents for 9400AWY
Page 7: ...ED 01 3DB 05653 DAAA 6 104 This page is intentionally blank...
Page 26: ...ED 01 3DB 05653 DAAA 25 104 This page is intentionally blank...
Page 56: ...ED 01 3DB 05653 DAAA 55 104 Figure 49 Wired minidistributor in a 21 rack...
Page 58: ...ED 01 3DB 05653 DAAA 57 104 Figure 51 ETSI Rack TRU in 9400 AWY...
Page 62: ...ED 01 3DB 05653 DAAA 61 104 Figure 55 IDU 1 0 and 1 1 for BTS vertical installation...
Page 104: ...ED 01 3DB 05653 DAAA 103 104 A 3 Repair form...
Page 105: ...ED 01 3DB 05653 DAAA 104 104 END OF DOCUMENT...