ED
01
3DB 05653 DAAA
39/104
2.3.
1+1 ODU configuration Installation with integrated antenna
2.3.1.
Required Parts Listing
- Integrated
antenna
-
Antenna Mounting Hardware (Identify hardware and quantity according to hardware Figure 1 on page
12, Figure 2 on page 12 and Figure 3 on page 13 and Table 1 on page 16).
-
Pole Mounting Assembly (Identify hardware and quantity according to hardware Figure 8 on page 15
and Table 1 on page 16).
-
Outdoor Unit and mounting hardware.
1
2
3
4
5
6
7
8
8
Figure 34 - Typical installation pole mounting with ODU 1+1 for integrated antenna
1) U
bolts
2) Pole
mounting
3) Radio
mounting
4)
Fastening points for COUPLER
5)
Screws fastening the antenna to the support
6)
Antenna screw-fastening slots
7)
RF Coupler Fastening brackets for ODU
8) Grounding
points
N.B.:
To avoid equipment damage the bolt tightening torque for fixing the bolts (5) to antenna
slots (6) must be 80 kg x cm (8 Newton x m) (5.76 lb.ft). For U-bolts (1) the bolt tightening
torque must be 342.3 kg x cm (33.55 Newton x m) (24.65 lb.ft). Exceeding this value may
result in bolt breaking.
Summary of Contents for 9400AWY
Page 7: ...ED 01 3DB 05653 DAAA 6 104 This page is intentionally blank...
Page 26: ...ED 01 3DB 05653 DAAA 25 104 This page is intentionally blank...
Page 56: ...ED 01 3DB 05653 DAAA 55 104 Figure 49 Wired minidistributor in a 21 rack...
Page 58: ...ED 01 3DB 05653 DAAA 57 104 Figure 51 ETSI Rack TRU in 9400 AWY...
Page 62: ...ED 01 3DB 05653 DAAA 61 104 Figure 55 IDU 1 0 and 1 1 for BTS vertical installation...
Page 104: ...ED 01 3DB 05653 DAAA 103 104 A 3 Repair form...
Page 105: ...ED 01 3DB 05653 DAAA 104 104 END OF DOCUMENT...