ED 01
3DB 05653 DAAA
40/104
2.3.2.
General Procedural Sequence
-
Install the pole mounting assembly on mast; see paragraph 2.2.4.1;
-
Install the antenna on the pole mounting, see paragraph 2.2.4.2;
-
Install the Coupler, see paragraph 2.3.3.1;
-
Install the ODU, see paragraph 2.2.5;
-
Point the antenna, see paragraph 2.2.6.
2.3.3.
Typical 1+1 installation
2.3.3.1. Installing the coupler
Grasp the coupler by the handle. Fasten the coupler to the support through the four locking hooks (1) that
will be tightened onto the relative fastening brackets on the radio support (2).
1
2
Figure 35 - Installing the Coupler To the Radio Support
Summary of Contents for 9400AWY
Page 7: ...ED 01 3DB 05653 DAAA 6 104 This page is intentionally blank...
Page 26: ...ED 01 3DB 05653 DAAA 25 104 This page is intentionally blank...
Page 56: ...ED 01 3DB 05653 DAAA 55 104 Figure 49 Wired minidistributor in a 21 rack...
Page 58: ...ED 01 3DB 05653 DAAA 57 104 Figure 51 ETSI Rack TRU in 9400 AWY...
Page 62: ...ED 01 3DB 05653 DAAA 61 104 Figure 55 IDU 1 0 and 1 1 for BTS vertical installation...
Page 104: ...ED 01 3DB 05653 DAAA 103 104 A 3 Repair form...
Page 105: ...ED 01 3DB 05653 DAAA 104 104 END OF DOCUMENT...