ED 01
3DB 05653 DAAA
58/104
3.2.2. Laborack
Figure 52 - Laborack
IDU Installation in Laborack
When you have correctly positioned the fixing brackets on the 19” unit, the front panel will hold the
equipment by four screws fitted into the laborack cage nuts.
Fasten the IDU to the rack by inserting screws into holes of 19” mechanical adaptors and by screwing them
into relevant holes provided with nut cage situated on rack brackets (see Figure 44 on page 51)
Summary of Contents for 9400AWY
Page 7: ...ED 01 3DB 05653 DAAA 6 104 This page is intentionally blank...
Page 26: ...ED 01 3DB 05653 DAAA 25 104 This page is intentionally blank...
Page 56: ...ED 01 3DB 05653 DAAA 55 104 Figure 49 Wired minidistributor in a 21 rack...
Page 58: ...ED 01 3DB 05653 DAAA 57 104 Figure 51 ETSI Rack TRU in 9400 AWY...
Page 62: ...ED 01 3DB 05653 DAAA 61 104 Figure 55 IDU 1 0 and 1 1 for BTS vertical installation...
Page 104: ...ED 01 3DB 05653 DAAA 103 104 A 3 Repair form...
Page 105: ...ED 01 3DB 05653 DAAA 104 104 END OF DOCUMENT...