Installation for the first time
129
Be sure to use a torque wrench to tighten the service port cap to a torque 18N
·
m.
Be sure to check the gas leakage.
4.3. Adding the refrigerant if the pipe length >5m
Procedure:
1). Connect the charge hose to the charging cylinder, open the 2-way valve and the 3-way valve.
Connect the charge hose which you disconnected from the vacuum pump to the valve at the bottom of the
cylinder. If the refrigerant is R410A, make the cylinder bottom up to ensure the liquid charge.
2). Purge the air from the charge hose.
Open the valve at the bottom of the cylinder and press the check valve on the charge set to purge the air (be
careful of the liquid refrigerant).
3) Put the charging cylinder onto the electronic scale and record the weight.
4) Operate the air conditioner at the cooling mode.
5) Open the valves (Low side) on the charge set and charge the system with liquid refrigerant.
6).When the electronic scale displays the proper weight (refer to the table), disconnect the charge hose from
the 3-way valve’s service port immediately and turn off the air conditioner before disconnecting the hose.
7). Mount the valve stem caps and the service port
Use torque wrench to tighten the service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
Electronic scale
Summary of Contents for AWAU-YCZ218-H11
Page 24: ...Dimensions Outdoor Units 97 AWAU YCZ536 H11...
Page 29: ...Wiring Diagrams 102 Outdoor Units AWAU YCZ327 H11 7SP091167 AWAU YCZ327 H11 7SP091171...
Page 30: ...Wiring Diagrams Outdoor Units 103 AWAU YCZ430 H11 7SP091168 AWAU YCZ430 H11 7SP091172...
Page 31: ...Wiring Diagrams 104 Outdoor Units AWAU YCZ536 H11 7SP091169 AWAU YCZ542 H11 7SP091173...
Page 107: ...SERVICE MANUAL Multi Splits Series...