Installation for the first time
128
coming out, then tighten the flare nut again. Make sure the pressure display in the pressure indicator is a
little higher than the atmosphere pressure. Then remove the charge hose from the 3 way valve.
8) Fully open the 2 way valve and 3 way valve and securely tighten the cap of the 3 way valve.
4.2. Air purging by refrigerant
Procedure:
1). Confirm that both the 2-way and 3-way valves are set to the closed position.
2). Connect the charge set and a charging cylinder to the service port of the 3-way valve.
3). Air purging.
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut on the
2-way valve approximately 45’ for 3 seconds then closing it for 1 minute; repeat 3 times.
After purging the air, use a torque wrench to tighten the flare nut on the 2-way valve.
4). Check the gas leakage.
Check the flare connections for gas leakage.
5). Discharge the refrigerant.
Close the valve on the charging cylinder and discharge the refrigerant by loosening the flare nut on the
2-way valve approximately 45’ until the gauge indicates 0.3 to 0.5 Mpa.
6). Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the open
position.
Be sure to use a hexagonal wrench to operate the valve stems.
7). Mount the valve stems nuts and the service port cap.
Summary of Contents for AWAU-YCZ218-H11
Page 24: ...Dimensions Outdoor Units 97 AWAU YCZ536 H11...
Page 29: ...Wiring Diagrams 102 Outdoor Units AWAU YCZ327 H11 7SP091167 AWAU YCZ327 H11 7SP091171...
Page 30: ...Wiring Diagrams Outdoor Units 103 AWAU YCZ430 H11 7SP091168 AWAU YCZ430 H11 7SP091172...
Page 31: ...Wiring Diagrams 104 Outdoor Units AWAU YCZ536 H11 7SP091169 AWAU YCZ542 H11 7SP091173...
Page 107: ...SERVICE MANUAL Multi Splits Series...