Re-installation while the indoor unit need to be repaired
131
6. Re-installation while the indoor unit need to be repaired
6.1. Collecting the refrigerant into the outdoor unit
Procedure
1). Confirm that both the 2-way and 3-way valves are set to the opened position
Remove the valve stem caps and confirm that the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the valve stems.
2). Connect the charge hose with the push pin of handle lo to the 3-way valves gas service port.
3). Air purging of the charge hose.
Open the handle Lo valve of the manifold valve slightly to purge air from the charge hose for 5 seconds and
then close it quickly.
4). Set the 2-way valve to the close position.
5). Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
6). Set the 3-way valve to the closed position immediately
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
Disconnect the charge set, and tighten the 2-way and 3-way valve’s stem nuts.
Use a torque wrench to tighten the 3-way valves service port cap to a torque of 1.8 kgf.m.
Be sure to check for gas leakage.
Summary of Contents for AWAU-YCZ218-H11
Page 24: ...Dimensions Outdoor Units 97 AWAU YCZ536 H11...
Page 29: ...Wiring Diagrams 102 Outdoor Units AWAU YCZ327 H11 7SP091167 AWAU YCZ327 H11 7SP091171...
Page 30: ...Wiring Diagrams Outdoor Units 103 AWAU YCZ430 H11 7SP091168 AWAU YCZ430 H11 7SP091172...
Page 31: ...Wiring Diagrams 104 Outdoor Units AWAU YCZ536 H11 7SP091169 AWAU YCZ542 H11 7SP091173...
Page 107: ...SERVICE MANUAL Multi Splits Series...