4.1 – RECEIVING AND INSPECTION
• Carefully remove the VELTRON II from the shipping container taking ESD (electrostatic discharge) precautions.
• Inspect unit for any damage. If damaged, contact freight company.
• Review the Factory Set-Up Information Sheet provided with the unit and verify the W.O. # and Serial # match those on
the unit. Verify that the configuration recorded on the Factory Set-Up Information Sheet is correct for your application.
If not, contact Air Monitor's Customer Service Department at 1-800-AIRFLOW for further guidance.
Note:
The VELTRON II has been configured and calibrated to customer specified parameters (see "Factory Setup
Information Sheet" provided with unit), and requires no additional calibration/verification prior to installation.
4.2 – LOCATION
• The VELTRON II is housed in a NEMA 1 enclosure which provides some degree of protection which is sufficient for
most clean indoor locations.
• Where additional protection is deemed necessary, the VELTRON II should be mounted in an enclosure with adequate
NEMA rating.
• The ambient temperature of the selected mounting location must be between 40º – 140ºF. Consideration should be
given to units installed in enclosures exposed to direct sunlight.
• The selected mounting location should be rigid and free of vibration.
4.3 – MOUNTING
Tools Required: Electric Drill; #25 (0.1495") or #26 (0.1470") Drill Bit; Screwdriver or Nutdriver; Four #8 - 32 Self-Tapping
Machine Screws
• The VELTRON II can be mounted in any position provided it is secured using all four mounting slots.
• Reasonable consideration should be given to clearances for pressure and electrical connections.
• Once a suitable location is found, mark the centers of the four mounting slots and drill four pilot holes. With the unit
in position, install the four #8 - 32 screws.
Figure 4.1