![Air Monitor MASS-tron II/CEM Installation, Operation And Maintenance Manual Download Page 12](http://html1.mh-extra.com/html/air-monitor/mass-tron-ii-cem/mass-tron-ii-cem_installation-operation-and-maintenance-manual_2875334012.webp)
MASS-tron II/CEM
Air Monitor Corporation
116-004-94.P65 (8-31-10)
MASS-tron II/CEM
- IO&M Manual
7
4.4 – PROCESS CONNECTIONS (con't)
If process being measured contains humidity or moisture, it is recommended a drip leg with drain on each tube/pipe be
installed to preclude the migration of water into the MASS-tron II/CEM. See Figure 4.2. for typical drip leg installation.
Figure 4.2
CAUTION
Migration of water into the MASS-tron II/CEM will void warranty.
SECTION 4 – INSTALLATION
Summary of Contents for MASS-tron II/CEM
Page 2: ......