USE OM - JANUARY 2017
32
Coil-Only Manufacturer
First Test Failure Options
(Efficiency at or above NAECA minimum)
Complete
Defective coil?
Refer to the general OM for the
defective claim requirements
Replace the defective
component and retest the
unit
Complete
Test Second Sample with
a Different Outdoor Unit
Same coil & AHRI
selects outdoor
unit from another
manufacturer
Second
Sample
Test
Rerate all combinations in that
BMG. Rerate will be the same % by
which the tested unit failed.
Obsolete
– All combinations in
that BMG will be derated and
obsolete.
Test Additional
Samples
Manufacturers
must supply
additional samples
within 30 days
Conduct
Additional
Testing
Figure D3: ICM First Test Failure Options