USE OM - JANUARY 2017
31
System Manufacturer First
Test Failure Options
(Efficiency Above NAECA
Minimum)
Rerate
– Rerate all
Combinations in the BMG
using the First Sample Test
Results
Complete
Total runtime < 16
hours?
Retest the same unit as
first sample test
Retest determines the
first test pas or failure.
Obsolete
– Entire
BMG is derated and
obsolete
Complete
Test Additional
Samples
Manufacturers
must supply
additional samples
within 30 days
Conduct
Additional
Testing
Yes
Defective unit?
Refer to general OM for
the defective claim
requirements
Replace the defective
component and retest the
unit
Figure D2: System Manufacturer First Test Failure Options