101
107110-01 - 6/16
XII. Operation
(continued)
Status Screen Display
Description
Priority:
Standby
Status:
Standby
(burner
Off
, circulator(s)
Off
)
Boiler is not firing and there is no call for heat, priority equals standby. The boiler
is ready to respond to a call for heat.
Priority:
Central Heat
Status:
Standby
(burner
Off
, circulator(s)
On
)
Boiler is not firing. There is a Central Heat call for heat and the Supply temperature
is greater than setpoint minus the “Diff Below”.
Priority:
Central Heat
Status:
Prepurge
When supply temperature drops burner demand continues with following Status
shown:
Safe Startup:
Flame circuit is tested.
Drive purge:
The blower is driven to the fan purge speed.
Prepurge:
After the blower reaches the fan purge speed setting the 10
second combustion chamber purge is conducted.
Priority:
Central Heat
Status:
Direct
ignition
After purge time is complete the following Status is shown:
Drive light-off: The blower is driven to light-off rate.
Pre-Ignition Test: After the blower reaches light-off rate a safety relay test is
conducted.
Pre-ignition:
Spark is energized and it is confirmed that no flame is present
Direct Ignition: Spark and Main fuel valve are energized.
Priority:
Central Heat
Status:
Running
(burner
On
, circulator(s)
On
)
After flame is proven the sequence continues with run stabilization and low
fire hold time. Once the field adjustable low fire hold time is completed normal
boiler operation begins, modulation rate depending on temperature and setpoint
selections.
Priority:
Domestic
Hot Water
Status:
Running
If the Central Heat call for heat is active and a Domestic Hot Water (DHW) call for
heat received the DHW demand becomes the “priority” and the modulation rate,
setpoint, “Diff Above” and “Diff Below” are based on DHW settings.
Priority:
Standby
Status:
Post-purge
(burner
Off
, circulator(s)
Off
)
If there is no call for heat the main fuel valve is closed and the blower is driven
to the fan post-purge speed. After the blower reaches the fan post-purge speed
setting the combustion chamber purge is conducted.
Priority:
Standby
Status:
Standby
Delay
Standby delay status is entered when a delay is needed before allowing the burner
control to be available. Select “Help” button from the “Home Screen” to determine
the cause of the Standby Delay.
Priority:
Standby
Status:
Lockout
A lockout status is entered to prevent the boiler from running due to a detected
problem. Select “Help” button from the “Home Screen” to determine the cause of
the Lockout. The last 5 Lockouts are recorded in the Lockout History.
E. Boiler Sequence of Operation
1. Normal Operation
Table 12.3: Boiler Sequence of Operation
Summary of Contents for K2WT
Page 82: ...82 107110 01 6 16 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Page 83: ...83 107110 01 6 16 X Wiring continued Figure 10 5 Internal Ladder Diagram ...
Page 84: ...84 107110 01 6 16 X Wiring continued ...
Page 85: ...85 107110 01 6 16 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued ...
Page 95: ...95 107110 01 6 16 Lighting and Operating Instructions XI Start Up and Checkout continued ...
Page 140: ...140 107110 01 6 16 XV Repair Parts continued ...
Page 142: ...142 107110 01 6 16 XV Repair Parts continued ...
Page 146: ...146 107110 01 6 16 XV Repair Parts continued ...
Page 148: ...148 107110 01 6 16 XV Repair Parts continued ...
Page 161: ...161 107110 01 6 16 ...
Page 162: ...162 107110 01 6 16 ...
Page 163: ...163 107110 01 6 16 ...