37
107110-01 - 6/16
Option #
25
26
27
28
29
30
31
32
33
34
35
36
37
38
Illustrated in Figure
7.22
7.22
7.22
7.22
7.22
7.22
7.22
7.22
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
7.23, 7.24
Pipe Penetration
Through Structure
Vent
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Roof
Intake
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Wall
Material
Vent
CPVC/PVC
(Note 2)
CPVC/PVC
(Note 2)
DuraVent
PolyPro
(Rigid)
DuraVent
PolyPro
(Rigid)
Selkirk
Polyflue
Selkirk
Polyflue
Centrotherm
InnoFlue SW
Centrotherm
InnoFlue
SW
DuraVent
PolyPro
(Rigid/Flex)
DuraVent
PolyPro
(Rigid/Flex)
Selkirk Polyflue
(Rigid/Flex)
Selkirk Polyflue
(Rigid/Flex)
Centrotherm
InnoFlue
(Rigid/Flex)
Centrotherm
InnoFlue
(Rigid/Flex)
Intake
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
PVC
Nominal Diameter
Vent
2”
3”
2”
3”
2”
3”
2”
3”
2”
3”
2”
3”
2”
3”
Intake
2” or 3”
3”
2” or 3”
3”
2” or 3”
3”
2” or 3”
3”
2” or 3”
3”
2” or 3”
3”
2” or 3”
3”
Min Equivalent Vent Length:
Min Equivalent Vent Length:
Models
K2WT-080
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
K2WT-100
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
48”
K2WT-120
Not Permitted
48”
Not Permitted
48”
48”
48”
48”
48”
48”
K2WT-150
52”
52”
52”
52”
52”
52”
52”
K2WT-180
52”
52”
52”
52”
52”
52”
52”
Max Equivalent Vent Length (Note 1):
Max Equivalent Vent Length (Note 1):
Models
K2WT-080
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
K2WT-100
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
60ft
135ft
K2WT-120
Not Permitted
135ft
Not Permitted
135ft
135ft
135ft
135ft
135ft
135ft
K2WT-150
135ft
135ft
135ft
135ft
135ft
135ft
135ft
K2WT-180
135ft
135ft
135ft
135ft
135ft
135ft
135ft
Rigid Vent Terminals
Vent
Coupling
w/Screen
Coupling
w/Screen
2PPS-12B or
2PPS-36B
w/Screen
3PPS-12B or
3PPS-36B
w/Screen
2PF-10UV or
2PF-39UV
w/Screen
3PF-10UV or
3PF-39UV
w/Screen
ISEP02 or
ISEP0239 w/
Screen
ISEP03 or
ISEP0339
w/Screen
Intake
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow w/
Screen
90 Elbow w/
Screen
Flex Termination
& Components
(Masonry Chimney
Chase) (Note 3)
Vent
2PPS-FK
2PPS-FLEX**
3PPS-FK
3PPS-FLEX**
2PF-FLEX-KIT
2PF-FLEX
3PF-FLEX-KIT
3PF-FLEX
IFCK02**
IFCK03**
Intake
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
Flex Termination
& Components
(B-Vent Chimney
Chase)
Vent
2PPS-VFT
2PPS-BF*
2PPS-FLEX**
3PPS-VFT
3PPS-BF*
3PPS-FLEX**
2PF-10UV or
2PF-39UV
w/Screen
2PF-BVSC
(Note 4)
3PF-10UV or
3PF-39UV
w/Screen
3PF-BVSC
(Note 4)
IFBK02****
IFBK03****
Intake
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
90 Elbow
w/Screen
Note 1: Max vent lengths shown also apply to the intake. Flex vent reduces the maximum allowable vent length.
See equivalent lengths for flex vent shown in Table 7.14 and sizing example on page 35.
Note 2: First 30” plus first exhaust elbow are CPVC.
Note 3: If masonry chimney contains flues in addition to that being used for chase,
aLL
must be unused.
Note 4: See Polyflue installation manual for gaskets, spacers and other required vent components.
All vertical terminals require compatible roof flashing and storm collars.
* Specify size of B vent (e.g. 2PPS-BV
6
is for use with 6” B vent).
** Specify length in feet.
**** Specify Flex length and B vent diameter (e.g. IFBK02
2505
includes 25ft of flex and used with 5” B vent).
Note 1: Max vent lengths shown also apply to the intake. Flex vent reduces the maximum allowable vent length.
See equivalent lengths for flex vent shown in Table 7.14 and sizing example on page 35.
Note 2: First 30” plus first exhaust elbow are CPVC.
Note 3: If masonry chimney contains flues in addition to that being used for chase,
aLL
must be unused.
Note 4: See Polyflue installation manual for gaskets, spacers and other required vent compone
nts
All vertical terminals require compatible roof flashing and storm collars.
Vii. Venting
D. Design Requirements Unique to Split Vent Systems
(continued)
Table 7.21: Summary of Split Vent System Options (cont.)
Summary of Contents for K2WT
Page 82: ...82 107110 01 6 16 Figure 10 4 Proper Installation of Header Sensor X Wiring continued ...
Page 83: ...83 107110 01 6 16 X Wiring continued Figure 10 5 Internal Ladder Diagram ...
Page 84: ...84 107110 01 6 16 X Wiring continued ...
Page 85: ...85 107110 01 6 16 Figure 10 6 Internal Wiring Connections Diagram X Wiring continued ...
Page 95: ...95 107110 01 6 16 Lighting and Operating Instructions XI Start Up and Checkout continued ...
Page 140: ...140 107110 01 6 16 XV Repair Parts continued ...
Page 142: ...142 107110 01 6 16 XV Repair Parts continued ...
Page 146: ...146 107110 01 6 16 XV Repair Parts continued ...
Page 148: ...148 107110 01 6 16 XV Repair Parts continued ...
Page 161: ...161 107110 01 6 16 ...
Page 162: ...162 107110 01 6 16 ...
Page 163: ...163 107110 01 6 16 ...