![Agria Cyclone 5900 Translation Of The Original Operating Instructions Download Page 78](http://html1.mh-extra.com/html/agria/cyclone-5900/cyclone-5900_translation-of-the-original-operating-instructions_2869819078.webp)
78
Hydrostatic implement carrier agria 5900 Cyclone
P
A
After every ... operating hours (h)
J
B
Pa
g
e
2
5
8
25
50
100
200
400
600
Check steering bar ultra
bushings
F
Tighten steering bar centre
screw
F
Check brake
F
Check the wheel motors
for straightline driving
F
Clean and adjust carburet-
tor
F
BM
Check compression pres-
sure
F
BM
Adjust valve play
F
BM
Clean cylinder head
F
BM
Lubricate all sliding parts
1
1
K
K 66
Lubricate bar latching pins
1
0
K
K 60
Change fuel filter 23 HP
4
W
54,
BM
Replace fuel hoses
W
*
BM
,54
Replace hydraulic hoses
W
6
A
= before each start-up
B
= after each cleaning, especially with a high-pressure cleaner
BM
= See separate operating instructions for engine
F
= maintenance tasks should be performed by your
agria
service
centre
J
= at least annually
K
= inspection and maintenance tasks can be performed by the operator
P
= position in lubrication plan
R
= as required
W
= maintenance tasks can be performed by a specialist workshop
*
= after 2 years
6
= after 6 years
Summary of Contents for Cyclone 5900
Page 4: ...4 agria 5900 Cyclone Designation of parts Fig A Fig B...
Page 22: ...2 Technical Data 22 Hydrostatic implement carrier agria 5900 Cyclone...
Page 80: ...80 Hydrostatic implement carrier agria 5900 Cyclone Petrol engine 23 HP...
Page 83: ...Hydrostatic implement carrier agria 5900 Cyclone 83 Declaration of Conformity...
Page 85: ...agria 5900 Cyclone 85 Fig C Petrol engine 14 HP...
Page 87: ...agria 5900 Cyclone 87 Fig D Petrol engine 23 HP...