Locating Discharge Opening
1. The last bolt hole in the chute should line up with the center of the discharge chute opening that is to
be cut. Therefore, you should be able to approximate an opening by measuring 9-1/2 in. above and
below the last bolt hole of the chute. Mark horizontal cut lines.
2. To find the vertical center of the chute opening, measure over 11 in. to the right and left of the chute
bolt rows. Mark center point. Then from the center point, measure 7 in. on both sides and mark verti-
cal cut lines.
3. Cut opening where marked, make sure corners have a minimum of 1-1/2 in. radius.
Figure 9-19
Locating Discharge Opening
A
22 in.
E
14 in.
B
11 in.
F
7 in.
C
19 in.
G
1-1/2 in. minimum radius at corners
D
9-1/2 in.
H
5
th
ring side sheet from base
Pneg-4460A
60 Ft Diameter 40-Series Bins