AfiMilk MPC
Installation Manual
71
First Time Operation
Chapter
7
Operating (top) electrode:
Connect the 100Ω resistor
between the Operating (top) electrode and the Common
(lower) electrode.
1.
Press
.
2.
H###
is displayed (
###
represents the calibration value).
3.
Press
a second time to calibrate the electrode.
AdJt
appears.
4.
The electrodes have been calibrated.
5.
Press
to exit editing mode.
Reviewing Calibrated Values of Electrodes
If milk meter fault leads to suspecting calibration problem, the technician may check
calibration value at the display:
1.
Ensure that
Afimilk MPC
is in wash mode
(
wash LED illuminated
).
2.
Type
2580
and press
to access programming mode.
3.
Press Group access number -
4
to enter Calibration Group
4.
Scroll down to
oA
(Operating Electrode).
6.
oA##
appears on the display panel. (
##
represents the calibration value.) If the
resulting value is less than
17
or more than
34
, electrode calibration is required.
7.
Press
to scroll to calibration value
oH
(Holding Electrode).
oH##
appears on the display panel. (
##
represents the calibration value.) If the
resulting value is less than
17
or more than
33
, electrode calibration is required.
5.
Press
+
(double press) to return to wash mode.
Summary of Contents for MPC 3
Page 1: ......
Page 2: ......
Page 3: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 14: ......
Page 31: ...Figure 8 Layout of Vacuum and Clean air Lines For Milk Meter Solenoids...
Page 32: ......
Page 64: ......
Page 80: ......
Page 96: ...Chapter 8 Unique Setup Configurations MPC Extender Connections Diagram...
Page 98: ......
Page 110: ...Chapter 11 Systems Accessories AfiMilk MPC Installation Manual 110...
Page 113: ...AfiMilk MPC Installation Manual 113 Parts List Chapter 12...