Operation Sequence
Chapter
3
AfiMilk MPC
Installation Manual
21
Operation Sequence
In all configurations,
Afimilk MPC
follows the
sequence of events charted in this chapter.
Sequence of Events within the Parlor
Session
Start
Power
Up
Transfer
AfiMilk MPC
into Milking Mode
Close Exit gates
Open Entry gates
Cows enters the
parlor
Auto Cow ID
Manual ID
Cow data sent to
control box
Alert Code
Attach Cluster
Milk to bucket
Milking
Flow Rate
Dropped?
Removal
All cows in load
Milked?
Open Exit Gate
Cows released
Open Entry Gate
Bring new load
Yes
No
Yes
No
Yes
No
Yes
No
Summary of Contents for MPC 3
Page 1: ......
Page 2: ......
Page 3: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 14: ......
Page 31: ...Figure 8 Layout of Vacuum and Clean air Lines For Milk Meter Solenoids...
Page 32: ......
Page 64: ......
Page 80: ......
Page 96: ...Chapter 8 Unique Setup Configurations MPC Extender Connections Diagram...
Page 98: ......
Page 110: ...Chapter 11 Systems Accessories AfiMilk MPC Installation Manual 110...
Page 113: ...AfiMilk MPC Installation Manual 113 Parts List Chapter 12...