Commissioning
40 – 52
Assembly instructions EN
SREH-50-IOL
Date 17.06.2022
Version 1.0
7
Commissioning
After connection, the smart rotation modules are put into operation for the first
time via the plant control system.
Commissioning must only be carried out in setup/jog mode!
7.1 Safety instructions for commissioning
DANGER
Risk of injury due to electric shock!
Unauthorized removal of the plug cover causes a risk of electric shock!
Do
NOT
dismount the plug cover!
Avoid any action on the module which could endanger safety!
CAUTION
Danger of injury in the working area of the smart rotary module!
During operation, persons who are in the working area can be injured.
During operation, ensure a good overview of the working area.
Unauthorised persons are not allowed in the work area.
CAUTION
Risk of injuries due to uncontrolled parts movements!
When the motor power supply is switched on, signals from the control can
lead to unintentional movements of the module and cause serious injuries or
damage to property.
Before working on the smart rotary module, make sure that the motor
power supply unit is switched off and secured against being switched on
again.
Only connect or disconnect the cables when the control is switched off!
CAUTION
Risk of injury due to mounted components!
Attachments on the smart rotary module can be a risk in conjunction with
moving parts.
Take appropriate measures to ensure safe operation!
Summary of Contents for SREH-50-IOL
Page 49: ...Assembly instructions EN SREH 50 IOL Date 17 06 2022 Version 1 0 49 52 ...
Page 50: ...50 52 Assembly instructions EN SREH 50 IOL Date 17 06 2022 Version 1 0 ...
Page 51: ...Assembly instructions EN SREH 50 IOL Date 17 06 2022 Version 1 0 51 52 ...
Page 52: ...52 52 Assembly instructions EN SREH 50 IOL Date 17 06 2022 Version 1 0 ...