ADAM-5510/P31
0-7
Chapter 0
4. Run the execution file “SIMU5000” on the “D” drive. The ADAM-
5510/P31 will be simulated as an ADAM-5000/485.
5. Press “Alt-X”, and then move the cursor to “Quit”, select “Yes”
and press <Enter>. The active directory will be changed to the
directory C:\5510.
6. Run the execution file “ADAM” in the directory C:\5510.
7. After displaying some processing messages, the screen shown in
Figure 0-3 will appear. This screen can be used for configuring and
calibrating ADAM-5000 I/O modules.
Figure 0-3:
Utility/Configure menu screen
8. This menu screen consists of a menu bar at the top of the screen
and a status field that displays information about the connected
modules. When you first start the program, it automatically scans
for any attached modules and displays their data. Module charac-
teristics, module configuration parameters and input or output
values will be displayed in the status field.
Summary of Contents for ADAM-5510/P31
Page 17: ...0 Quick Start...
Page 38: ...0 22 ADAM 5510 P31 Quick Start...
Page 39: ...1 Introduction...
Page 43: ...2 Installation Guidelines...
Page 52: ...2 10 ADAM 5510 P31 Installation Guideline Figure 2 10 ADAM 5510 P31 network address DIP switch...
Page 58: ...2 16 ADAM 5510 P31 Installation Guideline...
Page 59: ...3 System Specifications...
Page 65: ...4 I O Modules...
Page 116: ...4 52 ADAM 5510 P31 I O Modules...
Page 117: ...ADAM 5510 P31 5 1 Chapter 5 5 Troubleshooting...
Page 129: ...ADAM 5510 P31 A 1 Appendix A A Quick Start Example...
Page 132: ...A 4 ADAM 5510 P31 Quick Start Example...
Page 133: ...ADAM 5510 P31 B 1 Appendix B B COM Port Register Structure...
Page 137: ...ADAM 5510 P31 C 1 Appendix C C Data Formats and I O Ranges...
Page 147: ...D Performance...
Page 173: ...E RS 485 Network...
Page 181: ...ADAM 5510 P31 F 1 Appendix F F ADAM 4000 5000 System Grounding Installation...
Page 187: ...ADAM 5510 P31 G 1 Appendix G G Grounding Reference...