4-20
ADAM-5510/P31
I/O Modules
6. Only for ADAM-5018: Execute the CJC (cold junction sensor)
Calibration command. This can be done with the ADAM utility
software. (See the “CJC Calibration” option in the Calibration
submenu of the ADAM utility software.)
Figure 4-17:
Cold junction calibration
* Note:
Zero calibration and span calibration must be com-
pleted before CJC calibration. To calibrate CJC, the
thermocouple attached to ADAM-5018 and a stan-
dard thermometer should be used to measure a
standard known temperature, such as the freezing
point of pure water. The amount of offset between the
ADAM-5018 and the standard thermometer is then
used in the ADAM utility to complete CJC calibration.
Summary of Contents for ADAM-5510/P31
Page 17: ...0 Quick Start...
Page 38: ...0 22 ADAM 5510 P31 Quick Start...
Page 39: ...1 Introduction...
Page 43: ...2 Installation Guidelines...
Page 52: ...2 10 ADAM 5510 P31 Installation Guideline Figure 2 10 ADAM 5510 P31 network address DIP switch...
Page 58: ...2 16 ADAM 5510 P31 Installation Guideline...
Page 59: ...3 System Specifications...
Page 65: ...4 I O Modules...
Page 116: ...4 52 ADAM 5510 P31 I O Modules...
Page 117: ...ADAM 5510 P31 5 1 Chapter 5 5 Troubleshooting...
Page 129: ...ADAM 5510 P31 A 1 Appendix A A Quick Start Example...
Page 132: ...A 4 ADAM 5510 P31 Quick Start Example...
Page 133: ...ADAM 5510 P31 B 1 Appendix B B COM Port Register Structure...
Page 137: ...ADAM 5510 P31 C 1 Appendix C C Data Formats and I O Ranges...
Page 147: ...D Performance...
Page 173: ...E RS 485 Network...
Page 181: ...ADAM 5510 P31 F 1 Appendix F F ADAM 4000 5000 System Grounding Installation...
Page 187: ...ADAM 5510 P31 G 1 Appendix G G Grounding Reference...