![ADC Soneplex Soneplex Fiber Hub Cabinet SPX-CABFIN04 User Manual Download Page 17](http://html1.mh-extra.com/html/adc/soneplex-soneplex-fiber-hub-cabinet-spx-cabfin04/soneplex-soneplex-fiber-hub-cabinet-spx-cabfin04_user-manual_2848187017.webp)
LTPS-UM-8007-01, Issue 1
Prior to Installing the SPX-CABFIN
SPX-CABFIN01, SPX-CABFIN04
November 9, 2001
5
Accessibility
The closure should be placed not less than 42 inches (1.1m) from any obstruction, such as a fence or hedgerow.
Include adequate foundation pad footing area for craft personnel to perform maintenance procedures.
S
ITE
P
REPARATION
Figure 3.
Foundation Pad Dimensions
A cabinet mounting template (galvanized metal mounting plates with anchor bolts and support rails) is required
to locate the mounting bolts and access conduits in the foundation pad and is installed when the foundation pad is
constructed.
The cabinet is installed on a concrete pad that is cast-in-place. The foundation pad should be
made of concrete only; substitute materials, such as reinforced plastics, lack the rigidity
required by the cabinet and are not recommended.
A separate power transfer cabinet can be pedestal-mounted to the same pad or a separate pad,
or pole-mounted near the SPX-CABFIN cabinet. For the general positions of the SPX-CABFIN
cabinet and power transfer cabinet on the concrete pad, see
(for reference only; for
detailed information, refer to the template label and the work prints for your installation).
The SPX-CABFIN template must be ordered separately from ADC. Please contact your ADC
representative.
132" (3353 mm)
44"
18"
(457 mm)
(1118 mm)
146"
(3708 mm)
6"
(152 mm)
6"
(152 mm)
Power
chamber
Power
ped.
42"
(1067 mm)
52"
(1321 mm)