4. Energize the light fixture until there is a steady light, then turn the CCR off and unplug the light fixture.
5. Disassemble the light fixture, then remove the two-way electrical shunt (2.54 mm spacing) from the pins.
6. Assemble the light fixture and perform a functional test.
6.2.7 Reset the Fail Open converter 48010921 and 48011111
Parts
•
Fuse resistor spare part kit: 6132.00.250 (20pcs)
Info
•
Converter with 1 connector have 2 fuse resistors
•
Converter with 2 connectors have 4 fuse resistors
Reset / replace the fuse resistors
1. Disconnect and disassemble the light fixture.
2. Locate the fuse resistors, see
.
Figure 28: Converter with 1 connector
Figure 29: Converter with 2 connectors
3. Remove the fuse resistors by pulling away from the converter.
a. For converters with 1 connector, always replace both fuse resistors at the same time.
b. For converters with 2 connectors, always replace both fuse resistors related to the A/B channel that needs to be reset.
If both A and B channel needs a reset, replace all 4 fuse resistors.
4. Dispose the old fuse resistor.
5. Place the legs of the new fuse resistors in the sockets.
6. Assemble the light fixture and perform a functional test.
RELIANCE Inset Lights
Maintenance
34
Copyright
©
ADB Safegate, All Rights Reserved
Summary of Contents for RELIANCE AC
Page 2: ......
Page 8: ...RELIANCE Inset Lights List of Figures viii Copyright ADB Safegate All Rights Reserved ...
Page 10: ...RELIANCE Inset Lights List of Tables x Copyright ADB Safegate All Rights Reserved ...
Page 20: ...RELIANCE Inset Lights Introduction 10 Copyright ADB Safegate All Rights Reserved ...
Page 46: ...RELIANCE Inset Lights Spare Parts 36 Copyright ADB Safegate All Rights Reserved ...
Page 48: ...RELIANCE Inset Lights INTEROPERABILITY 38 Copyright ADB Safegate All Rights Reserved ...
Page 52: ...RELIANCE Inset Lights CABLE LOSS 42 Copyright ADB Safegate All Rights Reserved ...
Page 55: ...UM 0210 Rev 2 0 2020 04 30 45 Copyright ADB Safegate All Rights Reserved ...
Page 56: ......