Installation and Commissioning Guide - Advance Split Ducted Outdoor Unit
Doc. No.0525-085 Ver. 2 22xxxx
Installation and Commissioning Guide
Advance Outdoor Units
4
PRELIMINARY DATA ONLY
Ver. 2.04 220704
THIS LABEL TO BE REMOVED ON SIGN-OFF
Installation and Commissioning Guide
Introduction
CONGRATULATIONS
on your purchase of an ActronAir air conditioning system! This unit has been designed and
engineered to provide optimum air conditioning and to achieve maximum energy efficiency.
Your air conditioning system has been manufactured from the highest quality materials. Numerous “in house” and
“external” inspection and test procedures were conducted to your air conditioner to ensure satisfactory operation.
Information About This Guide
This guide provides installation instructions, specific to your split ducted unit. Read this manual thoroughly and take into
consideration all specifications and instructions to ensure correct installation and safe operation of your air conditioning
system.
NOTE
Print a copy of this document and keep it for future reference. Ensure all technicians that work on the unit can refer to this
manual at any time.
Product Inspections
Check your air conditioning unit and all items against the invoice upon receiving your shipment. Inspect the unit,
components and accessories for any sign of damage. If there is any damage to the unit, contact ActronAir Customer Care
Department immediately on:
1300 522 722
to obtain a Goods Return Number.
Check the unit nameplate to verify the model, serial number, electrical rated specifications are correct.
Codes, Regulations And Standards
The installer and/or contractor assumes responsibility to ensure that unit installation complies with the relevant council,
state / federal codes, regulations and building code standards. All electrical wiring must be in accordance with current
electrical authority regulations and all wiring connections to be as per electrical diagram provided with the unit