3 System upgrades
42
(4) Engage the load lever back into place.
8
Apply the thermal interface material.
(1) Use an alcohol pad to wipe off the old thermal grease
from both the heat sink and the processor socket
retention plate.
(2) Apply a thin layer of an approved thermal interface
material before installing the heat sink.
Make sure that only a very thin layer is applied so that
both contact surfaces are still visible.
9
Install the heatsink (see “Installing a heatsink” on page 38).
10 Observe the post-installation instructions described on page 25.
11 Repeat the steps above to replace the second processor.
Summary of Contents for AR180 F1 Series
Page 1: ...AR180 F1 Series User Guide ...
Page 6: ...vi manufacturer Dispose of used batteries according to the manufacturer s instructions ...
Page 18: ...xviii ...
Page 19: ...1 System tour ...
Page 33: ...2 System setup ...
Page 40: ...2 System setup 22 ...
Page 41: ...3 System upgrades ...
Page 49: ...31 3 Lock the HDD carrier 4 Observe the post installation instructions described on page 25 ...
Page 74: ...3 System upgrades 56 ...
Page 75: ...4 System BIOS ...
Page 111: ...93 are designed for maximum system stability but not for maximum performance ...
Page 112: ...4 System BIOS 94 ...
Page 113: ...5 System troubleshooting ...
Page 123: ...Appendix A Server management tools ...
Page 135: ...Appendix B Rack mount configuration ...
Page 146: ...Appendix B Rack mount configuration 128 ...
Page 147: ...Appendix C Acer Smart Console ...
Page 176: ...Appendix C Acer Smart Console 158 ...