������������ ���� ���������� ������������ 11
ABS lifting station Sanimat
Control line (3) has a continuous rise as shown in Figure 9.
The control line should be shortened where necessary, pushed on to the hose nozzle of the submerged tube
screw connector (5).
The submerged tube screw connector (5) is prevented from turning by using an open ended spanner SW 13
and a spigot nut (4) is fully tightened.
ATTENTION
The submerged tube fixing screw (5) should not be twisted.
4.
������������ �f �h� ������� ����
ATTENTION
The control unit should be fitted above possible flood level in a well ventilated room
and in an easily accessible position. Protection Class of the control unit IP 54.
The control unit should be secured at all fixing points. The fixing holes are accessible after unscrewing the
lower housing cover.
ATTENTION
Do not drill through the housing of the control unit itself.
NOTE
The mounting location of the control unit should be chosen in such a manner that the
control line rises in a continuous manner to the control unit. The control line must not
be kinked.
NOTE
A number of different control box models exist. Please check the wiring diagram/
instruction manual in the control box.
4.
E��������� C���������
c
Before commissioning an expert should check that one of the necessary electrical protective devices
is available. Earthing, neutral, earth leakage circuit breakers, etc. must comply with the regulations
of the local electricity supply authority and a qualified person should check that these are in perfect
order.
ATTENTION
The power supply system on site must comply with VDE or other local regulations
with regard to cross-sectional area and maximum voltage drop. The voltage stated on
the nameplate of the pump must correspond to that of the mains
The power supply cable must be protected by an adequately dimensioned slow-blow fuse corresponding to the
rated power of the pump.
c
The incoming power supply as well as the connection of the pump itself to the terminals on the control
panel must comply with the circuit diagram of the control panel as well as the motor connection
diagrams and must be carried out by a qualified person.
All relevant safety regulators as well as general good technical practice must be complied with.
NOTE
The overload relay in the control unit has been correctly set at the factory.
NOTE
Please consult your electrician.