The rooms in which lifting stations are installed must be of adequate dimensions so that beside and over all
control elements or items where maintenance might be required a working area of at least 60 cm width or height
is available.
Electrical supply to suit the submersible pumps being used.
NOTE
Fusing, cable cross-section and voltage drop of the power line must comply with
DIN/EN and the relevant electricity supply board regulations.
Any openings required in walls or ceilings for discharge, vent or inlet lines, must be of adequate dimensions so
that the openings used can be sealed off using noise absorbing materials.
The inlet lines must be laid in such a manner that there is a continuous fall of the prescribed magnitude to the
inlet ports of the collection tank.
NOTE
When installing lifting stations the noise protection regulations in buildings to DIN
4109 should be observed.
4.
������������ �f �h� ���������� ���k
Determine the installation location and set-up the tank so that it is on level ground and horizontal in all
directions.
Secure the collection tank against movement or floating with the aid of plugs (3) hex screws (2) and washers (2).
ATTENTION
Provide also for later positioning of the submersible pumps. The submersible pumps
should be installed on the ground at the same level as the collection tank.
ATTENTION
Do not over-tighten hex screw (2), or the collection tank (1) may be damaged.
1033-00
Figure 4 Bolting down of the collection tank
NOTE
Hexagon head wood screw 10 x 130 dowel size 12 (not supplied)