
������������ ���� ���������� ������������
ABS lifting station Sanimat
4.5
������������ �f �h� ��bm����b�� ��m�
4.5.1
M�������� �f �h� v����� �������
1035-00
Figure 6 Mounting of volute support
ATTENTION
The area where the pump stands should be smooth and level. The distance from the
centre line of the discharge port to the centre line of the discharge port comprises
460mm in the case of twin pumping stations.
Fit flexible connection (8) with clamp (7) to the pump connection port of the collection tank (1).
Press the volute support (6) into the flexible connector (8) and mark the position of the volute support (6) on the
floor.
Remove volute support (6). Drill plug holes and fit plugs (4).
Press clamp (7) on to the flexible connector, locate the volute support in position and tighten clamp (7) (fix
screws (4) and washers.
Locate submersible pump (5) and seal (3) at the volute support (6) and fasten using hex bolts and nuts.
4.5.
������������ �f �h� ��m� h���� �������
1047-00
1048-00
Figure 7 Fitting of head support AS S17 - S26
Figure 8 Fitting of head support AFP M15 - M60