ABL POLEMH6 Installation Manual Download Page 6

|     Important information  –   

User information

6

 

ƒ

Electrical installation and testing must be carried out with reference to local rules by a qualified specialist 

electrical contractor, who, on the basis of their specialist training and experience, as well as their knowledge of 

the relevant standards, is able to assess and carry out the working steps described in this manual and recognise 

potential hazards.

WARNING!

Notification or approval requirement for charging stations

Please note that electrical grid operators, energy suppliers or national regulations may require notification of or 

approval for the installation or operation of a charging station.

 

ƒ

A Duty to Notify applies in Germany according to §19 NAV.

 

ƒ

In case of installation faults, or malfunctions that can be traced back to faulty installation, always contact the 

contractor who carried out the installation first.

 

ƒ

The product must not be covered with other objects or materials.

 

ƒ

No liquids or receptacles containing liquids must be placed on the product.

 

ƒ

Please note that the POLEMH6 mounting pole must never be installed directly on asphalt! To ensure safe and 

proper mechanical installation, the optionally available EMH9996 concrete foundation or a functionally equivalent 

alternative must always be provided.

 

ƒ

Do not under any circumstances make alterations to the product. Any disregard of this instruction represents a 

safety risk, fundamentally breaches the guarantee provisions and may void the warranty with immediate effect.

 

ƒ

Malfunctions affecting the safety of persons, connected electric devices or the device itself must be resolved by a 

qualified specialist electrical contractor.

 

ƒ

Should one of the following malfunctions occur, please contact the specialist electrical contractor who has carried 

out the installation of your wallbox and accessories:

 

y

The product housing has been damaged mechanically, or the housing cover has been removed or can no longer 

be closed.

 

y

Sufficient protection of the small distribution board against splashing water and/or foreign objects is no longer 

provided.

 

y

The product does not function properly or has been otherwise damaged.

WARNING!

Observation of further safety instructions

Please always observe all further safety instructions in the manuals for the optionally available eMH3 Wallbox 

and other accessories for the POLEMH6.

User information

 

ƒ

Ensure that rated voltage and rated current of the supply cable at the installation location comply with the param-

eters of your local electricity grid and that the rated output of the wallbox(es) installed on the POLEMH6 is not 

exceeded during operation.

 

ƒ

Local safety regulations regarding the operation of electrical devices for the country in which you operate the 

wallbox(es) installed on the POLEMH6 always apply.

 

ƒ

Never install or operate the POLEMH6 in confined spaces. In particular, it must be ensured that vehicles can be 

parked at a suitable distance from the POLEMH6 for charging and can be connected to the charging cable without 

tension.

 

ƒ

Make sure that the POLEMH6 is always closed and locked when in use. All authorised users must be aware of the 

'unlock' position of the key.

 

ƒ

No user-maintainable parts are located inside the device.

 

ƒ

Only have the POLEMH6 repaired by a qualified specialist electrical company.

Summary of Contents for POLEMH6

Page 1: ...EN Article No 0301697_EN_a Installation manual POLEMH6...

Page 2: ...o abl de www ablmobility de Customer Service 49 0 9123 188 0 service abl de www ablmobility de de service support Revision 0301697_EN_a version 10 12 2021 Th i n k b e f o r e y o u p r i n t NOTE Ple...

Page 3: ...tions for the mechanical installation of the POLEMH6 13 Laying the EMH9996 foundation 14 Installing the POLEMH6 on the EMH9996 foundation 16 Specifications for the mechanical and electrical installati...

Page 4: ...visit https www ablmobility de en Intended use The POLEMH6 mounting pole is designed for the outdoor installation of one or two eMH3 Wallboxes In order to en sure the necessary stability the POLEMH6 c...

Page 5: ...e NOTE Indicates important information for operation or installation Sections marked with this symbol indicate further important information and features necessary for successful operation Actions mar...

Page 6: ...nnected electric devices or the device itself must be resolved by a qualified specialist electrical contractor Should one of the following malfunctions occur please contact the specialist electrical c...

Page 7: ...ter it has been installed without any techni cal faults and subsequently approved by a qualified specialist electrical company NOTE Changes to functions and design features Please note that all techni...

Page 8: ...ck A D C B D A These four thread points are used to attach the mounting plate of the eMH3 Wallbox The required M8 25 rounded head screws are included with the POLEMH6 B These two thread points are use...

Page 9: ...below via two recessed empty conduits DN 100 NOTE Using a custom foundation These instructions describe how to install the POLEMH6 on the EMH9996 concrete foundation In principle it is possible to mak...

Page 10: ...mount the base of the POLEMH6 mounting pole using the washers and M10 35 hexagon socket screws supplied B The two empty conduits are used to feed the supply and data cables through the foundation int...

Page 11: ...ation on the POLEMH6 in section Technical spec ifications on page 28 Items supplied The product is delivered including the following components POLEMH6 mounting pole 1 piece Key for unlocking the hous...

Page 12: ...nting pole POLEMH6 h 420 mm w 420 mm d 420 mm WPR36 Weather shield for installation on an exterior wall or the mounting pole POLEMH6 h 142 mm w 515 mm d 285 mm CABHOLD Cable holder with charging plug...

Page 13: ...es installed on the POLEMH6 in a group installation suitable data cables must also be laid to the installation location Suitable collision protection must be provided on site to provide the POLEMH6 wi...

Page 14: ...cklaying tools Concrete screed mixed Vacuum lifting tool optional Laying the EMH9996 foundation The optional EMH9996 concrete foundation from ABL provides a level installation surface for the POLEMH6...

Page 15: ...ed anchors for screwing the POLEMH6 in place As the POLEMH6 can be mounted on the foundation in any direction 0 90 180 270 the empty conduits on the side of the EMH9996 can be aligned with the supply...

Page 16: ...r connection to the high current terminals in the small distribution board of the POLEMH6 7 Run data cables with sufficient length approx 2 0 m through the same or the second empty con duit for the su...

Page 17: ...mmendations when connecting the power and data cables Power line To connect to the terminal block on the lowest standard rail of the small distribution board a cable length of approx 0 8 m from the fo...

Page 18: ...ower line through the lower PG cable gland into the case of the small distribution board and secure the cable gland NOTE Strain relief for the power line A cable clamp is recommended to secure the sup...

Page 19: ...Ground and short circuit 5 Cover or bar access to adjacent components under voltage The supply cable must not be reconnected to the electricity grid until Step 4 in the section Electrical connection o...

Page 20: ...Installing the eMH3 Wallbox on the POLEMH6 This section describes how to install an eMH3 wallbox on the POLEMH6 Proceed as follows 1 Screw the mounting plate of the eMH3 Wallbox to one side of the mou...

Page 21: ...e the spring loaded mechanism of the PE terminal and attach the protective earth conductor y Use the connection pattern for TN systems on page 24 to allocate the wires 1 5 m NOTE Detailed information...

Page 22: ...ic components cover onto the wallbox housing and fix it into place with the screw you removed in Step 3 WARNING Proper routing of the data cables Run the data cables through the two openings at the bo...

Page 23: ...NGER Dangerous electrical currents Always observe the 5 safety rules 1 Cut power source 2 Secure all cut off devices 3 Verify absence of voltage 4 Ground and short circuit 5 Cover or bar access to adj...

Page 24: ...Connection pattern for 3 phase TN system Designation Wire strand colour recommended Labelling Phase 1 current carrying conductor Brown L1 Phase 2 current carrying conductor Black L2 Phase 3 current ca...

Page 25: ...allation of a second eMH3 Wallbox The POLEMH6 is designed for the installation and operation of two eMH3 Wallboxes Please observe the following instructions when installing a second wallbox Make sure...

Page 26: ...th the connection pattern for 3 phase TN systems Safety instructions for start up and operation Before initial operation of the wallbox installed on the POLEMH6 you must observe the following safety n...

Page 27: ...stream RCCB MCB The internal RCCB MCB of the wallbox are not switched on Check the RCCB MCB on the wallbox NOTE Detailed information on other causes of errors The installation instructions for the eMH...

Page 28: ...anslucent colour film Integrated components Small distribution board with three top hat rails 200 35 mm and high current terminals 35 mm 5 pin two bridged terminals per pin C profile rail Locking mech...