| Installation –
Installing the POLEMH6 on the EMH9996 foundation
16
4
Make sure the foundation is level in all planes on
the cement mortar layer and then create a sup-
porting structure all the way around the foundation
with concrete screed (45° smooth line to around the
lower edge of the conduit openings).
Glättkelle
5
Allow the concrete to set completely over a reason-
able period of time so that the foundation is pro-
tected from slipping when the ditch is eventually
filled and compacted with compactable soil.
6
Run a supply cable with sufficient length (approx.
0.8 m) through an empty conduit of the foundation
for connection to the high-current terminals in the
small distribution board of the POLEMH6.
7
Run data cables with sufficient length (approx.
2.0 m) through the same or the second empty con-
duit for the subsequent installation of the wallbox
on the mounting pole.
8
Fill the entire ditch around the foundation to ground
level with compactable soil.
y
The soil must be filled and compacted in layers
and evenly on all sides.
9
Smooth out the surface.
Installing the POLEMH6 on the EMH9996 foundation
After placing the foundation, you can install the POLEMH6 on the EMH9996.
Proceed as follows:
1
Unlock the double cylinder pivot lever of the
POLEMH6.
y
Slide the cover of the left-hand locking cylinder
to the side.
y
Unlock the locking cylinder with the key
supplied.
y
Flip the control lever outwards and turn it up-
wards 180°.