
| Installation –
Installing the POLEMH6 on the EMH9996 foundation
18
5
Use the slotted screwdriver to loosen the eight
screws in the upper part of the small distribution
board and pull off the upper part.
6
Run the power line through the lower PG cable
gland into the case of the small distribution board
and secure the cable gland.
NOTE
Strain relief for the power line
A cable clamp is recommended to secure the supply cable in the profile rail under the small distribution board.
This then serves as strain relief for the electrical connection.
7
Lay the data cables behind the sheet metal cover of
the small distribution board.