Proceed as follows:
1
Dig a ditch suitable for the EMH9996 foundation
(recommended: 100 × 100 cm).
y
Take into account the dimensions of the foun-
dation (H × W × D: 420 × 420 × 420 mm) as well
as a levelling layer (crushed rock/gravel) and a
cement mortar layer of about 10 cm under the
foundation.
100
100
52
2
Apply a first layer of cement mortar with a height
of approx. 10 cm at the positioning location of the
foundation.
100
52
10
NOTE
Alignment of the foundation
Please note the following instructions for aligning the EMH9996:
The top of the EMH9996 can be identified by the recessed threaded anchors for screwing the POLEMH6 in
place.
As the POLEMH6 can be mounted on the foundation in any direction (0°/90°/180°/270°), the empty conduits
on the side of the EMH9996 can be aligned with the supply and data cables in the ditch as required.
3
Place the foundation centrally on the cement mortar
layer.
y
This step must be performed by two people.
NOTE
Wiring of the empty conduits
The two empty conduits on the EMH9996 ensure a high degree of flexibility when laying the cabling for group
installations.
For a series connection in a group installation, you can run the power cable along with shielded data cables
through one empty conduit or distribute them between the two empty conduits.
For unshielded data cables, it is recommended to use one empty conduit exclusively for the power cable and
the other for the data cables.