2 Installation
2.2.9. Fitting the cable package IRBDP SW5 CE (SpotPack Basic)
89
3HAC027309-001 Revision: D
©
Co
py
rig
h
t 200
6-
201
0 ABB. All righ
ts reser
v
ed.
8. Fit the process cable package to the
connection box
.
xx0800000082
Parts:
•
A: Connection box
9. Fit the process cable package to the
water
and air unit
.
xx0800000083
Parts:
•
A: Water and air unit
10. Fit the process cable package to the
bracket back lower with the
spiral hose
clamp
.
Shown in the figure
.
11. Fit the process cable package to the lower
bracket with the
spiral hose clamp
.
Shown in the figure
.
12. Fit the process cable package to the
gripping clamp
on the
lower bracket
.
Shown in the figure
.
13. Secure the process cable package with the
velcro straps.
Shown in the figure
.
14. Fit the process cable package to the
gripping clamp
on the axis 3 clamp mount.
Shown in the figure
.
15. Fit the process cable package to the
gripping clamp
on the
adjustable bracket
.
Shown in the figure
.
16. Fit the process cable package in the
ball
joint housing
on the
adjustable bracket
.
Shown in the figure
.
Action
Note
Continued
Continues on next page