2 Installation
2.2.8. Fitting the upper arm cable package - IRBDP MH 3 UE
3HAC027309-001 Revision: D
82
©
Co
py
rig
h
t 200
6-
201
0 ABB. All righ
ts reser
v
ed.
Procedure
This procedure details how to fit the cable package IRBDP MH 3 UE.
How to fit the cable package IRBDP MH 3 LE, is detailed in section
cable package - IRBDP MH 3 LE on page 74
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots:
Do not turn off the air pressure to motors and
SMB.
2.
CAUTION!
The cable package is sensitive to mechanical
damage. They must be handled with care,
especially the connectors, in order to avoid
damaging them.
3. Push the customer signal and power cables as
well as air hose into the upper arm tube from
the rear and pull it out of the hole on the side of
the wrist where the
bracket at wrist
is placed.
Arrange cables and hose so no cables or hoses
are twisted.
NOTE!
Be careful not to damage the existing motor
cables!
Shown in the figure
arm cable package - IRBDP MH 3 UE
on page 81
.
Continued
Continues on next page
Summary of Contents for SpotPack IRB 6620
Page 1: ...ABB Robotics Product manual DressPack SpotPack IRB 6620 ...
Page 2: ......
Page 8: ......
Page 288: ......
Page 289: ......