A request initiates to reserve other bays to prevent simultaneous operation.
•
Actual position inputs for interlocking information are read and evaluated if
the operation is permitted.
•
The synchrocheck/synchronizing conditions are read and checked, and
performs operation upon positive response.
•
The blocking conditions are evaluated
•
The position indications are evaluated according to given command and its
requested direction (open or closed).
The command sequence is supervised regarding the time between:
•
Select and execute.
•
Select and until the reservation is granted.
•
Execute and the final end position of the apparatus.
•
Execute and valid close conditions from the synchrocheck.
At error the command sequence is cancelled.
In the case when there are three one-phase switches (SXCBR) connected to the
switch controller function, the switch controller will "merge" the position of the
three switches to the resulting three-phase position. In case of a pole discordance
situation, that is, the positions of the one-phase switches are not equal for a time
longer than a settable time; an error signal will be given.
The switch controller represents the content of the SCSWI logical node (according
to IEC 61850) with mandatory functionality.
11.1.1.3
Switches SXCBR
M16602-3 v6
Switches are functions used to close and interrupt an ac power circuit under normal
conditions, or to interrupt the circuit under fault, or emergency conditions. The
intention with these functions is to represent the lowest level of a power-switching
device with or without short circuit breaking capability, for example, circuit
breakers, disconnectors, earthing switches etc.
The purpose of these functions is to provide the actual status of positions and to
perform the control operations, that is, pass all the commands to the primary
apparatus via output boards and to supervise the switching operation and position.
Switches have the following functionalities:
•
Local/Remote switch intended for the switchyard
•
Block/deblock for open/close command respectively
•
Update block/deblock of position indication
•
Substitution of position indication
•
Supervision timer that the primary device starts moving after a command
•
Supervision of allowed time for intermediate position
•
Definition of pulse duration for open/close command respectively
1MRK 504 169-UEN A
Section 11
Control
Transformer protection RET650 2.2 IEC
181
Application manual
Summary of Contents for ret650
Page 1: ...RELION 650 SERIES Transformer protection RET650 Version 2 2 Application manual...
Page 2: ......
Page 28: ...22...
Page 38: ...32...
Page 42: ...36...
Page 80: ...74...
Page 168: ...162...
Page 174: ...168...
Page 250: ...244...
Page 346: ...340...
Page 366: ...360...
Page 390: ...384...
Page 391: ...385...