
11
Load-conductors / knockout removal
The bottom end-walls / knockout plates on the back-wall can
be removed from the enclosure for ease of knockout removal.
Once knockouts for required conduit/ conductors are punched
out, the bottom end-wall or knockout plate can be re-installed.
Conductors can be pulled through the knockouts before re-in-
stallation of the plates to the enclosure.
Phase balancing from the factory
For 3-Phase-IN to 1-Phase-OUT systems
The products are phase-balanced in the factory as follows:
Changing the phase balance
Standard 125-225A meter-sockets, without lever-bypass
1. Loosen phase-balance strap at vertical and meter-socket
connection
2. Swipe strap to position required
3. Retighten strap at vertical and meter-socket connection.
Torque 170 in-lbf.
Position
Number of Gangs
1-Gang
2-Gang
3-Gang
4-Gang
5-Gang
6-Gang
1
meter at
the top
A-C
A-C
A-C
A-C
A-C
A-C
2
A-B
A-B
A-B
A-B
A-B
3
B-C
B-C
B-C
B-C
4
A-C
A-C
A-C
A-C
5
A-B
A-B
6
B-C
Position A–C
Position A–B
Position B–C
Lever-Bypass 225A Meter-sockets
Parts included with the product (in polybag):
1. Turn off power supplying the equipment
Conversion from A-C to B-C
2. Remove the strap in position A.
3. Install phase-link, insulation and 3/8 bolt in position A-B.
4. Install strap in position B.
5. Tighten all connections to 170 in-lbf.
Conversion from A-C to A-B
2. Remove the strap in position C.
3. Install phase-link, insulation and 3/8 bolt in position B-C.
4. Install strap in position B.
5. Tighten all connections to 170 in-lbf.
Conversion from B-C to A-C
2. Remove phase-link and strap in position B.
3. Install strap in position A.
4. Do not use phase-link and insulation sheet
5. Tighten all connections to 170 in-lbf.
Warning:
Hazardous Voltage can cause serious injury or death.
Lock out power before working inside the unit.